Global programme view
Assurance Command Center
One operational view from plans and requirements through evidence, release and airworthiness clearance.
Enterprise demonstration: this front-end shows the information architecture and workflows a global company would configure. Production deployment would connect identity, databases, document repositories, electronic signatures and immutable audit services.
Lifecycle evidence92%2,418 / 2,628 accepted
Bidirectional traceability97.6%41 gaps require disposition
Open findings183 high-priority
Release readiness86%6 conditions outstanding
Clearance blockers3Owner and due date assigned
Lifecycle gates & decision readiness
Programme stage-gate healthEnd-to-end traceability
Representative assured chainSYS-441System need
HLR-1182Software HLR
LLR-2388Low-level req.
TC-7781Verification case
EV-9077Objective evidence
My priority actions
Role-based work queue| Priority | Work item | Domain | Due | Status |
|---|
DO-178C Software91%
13 objectives pending; 2 independence actions.
On planDO-254 Hardware84%
FPGA verification and device data in review.
AttentionCEMILAC / IMTAR78%
Form 22C draft; 3 clearance findings open.
In preparation| Platform | System | LRU | Software / AEH |
|---|---|---|---|
| Advanced UAS | Flight Controls | FCC-01 | OFS 7.4 · FPGA 3.2 |
| Advanced UAS | Mission System | MC-02 | Mission SW 4.1 |
| Metric | BL-7.3 | BL-7.4 RC2 | Delta |
|---|---|---|---|
| Requirements | 1,804 | 1,846 | +42 |
| Passed tests | 4,918 | 5,106 | +188 |
| Open SPRs | 4 | 7 | +3 |
Enterprise controls
Target operating modelSSO + MFAEnterprise identity federation
RBAC / ABACRole and programme scopes
E-signaturesMeaning, intent and timestamp
Immutable auditAppend-only lifecycle history
Data residencyRegional tenant policies
API & eventsControlled integration layer
Backup / DRRecovery objectives monitored
RetentionContract and authority rules
Connected toolchain
Illustrative enterprise integrationsRequirementsDOORS / Polarion
SourceGit / code review
CI/CDControlled builds
TestResults & coverage
PLM / ALMConfiguration items
IdentitySSO / SCIM
Audit stream
Recent controlled eventsClearance pulse
CEMILAC / IMTAR preparationForm register8 / 9
Evidence index81%
Concurrence4 / 6
Findings closed8 / 11