A1
AeroAssure EnterpriseIntegrated airworthiness & product assurance
AR
Global programme view

Assurance Command Center

One operational view from plans and requirements through evidence, release and airworthiness clearance.

Enterprise demonstration: this front-end shows the information architecture and workflows a global company would configure. Production deployment would connect identity, databases, document repositories, electronic signatures and immutable audit services.
Lifecycle evidence92%2,418 / 2,628 accepted
Bidirectional traceability97.6%41 gaps require disposition
Open findings183 high-priority
Release readiness86%6 conditions outstanding
Clearance blockers3Owner and due date assigned

Lifecycle gates & decision readiness

Programme stage-gate health
Gate review: 21 Nov

End-to-end traceability

Representative assured chain
Continuity monitored
SYS-441System need
HLR-1182Software HLR
LLR-2388Low-level req.
TC-7781Verification case
EV-9077Objective evidence

My priority actions

Role-based work queue
PriorityWork itemDomainDueStatus
DO-178C Software91%

13 objectives pending; 2 independence actions.

On plan
DO-254 Hardware84%

FPGA verification and device data in review.

Attention
CEMILAC / IMTAR78%

Form 22C draft; 3 clearance findings open.

In preparation
PlatformSystemLRUSoftware / AEH
Advanced UASFlight ControlsFCC-01OFS 7.4 · FPGA 3.2
Advanced UASMission SystemMC-02Mission SW 4.1
MetricBL-7.3BL-7.4 RC2Delta
Requirements1,8041,846+42
Passed tests4,9185,106+188
Open SPRs47+3

Enterprise controls

Target operating model
Configured
SSO + MFAEnterprise identity federation
RBAC / ABACRole and programme scopes
E-signaturesMeaning, intent and timestamp
Immutable auditAppend-only lifecycle history
Data residencyRegional tenant policies
API & eventsControlled integration layer
Backup / DRRecovery objectives monitored
RetentionContract and authority rules

Connected toolchain

Illustrative enterprise integrations
7 services
RequirementsDOORS / Polarion
SourceGit / code review
CI/CDControlled builds
TestResults & coverage
PLM / ALMConfiguration items
IdentitySSO / SCIM

Audit stream

Recent controlled events

Clearance pulse

CEMILAC / IMTAR preparation
Open workspace
Form register
8 / 9
Evidence index
81%
Concurrence
4 / 6
Findings closed
8 / 11